Source: Mental Health Australia
Road users are advised of changed traffic conditions for drain repairs on The Northern Road, between Marylands Link Road 1 and Marylands Link Road 2, Bringelly.
The repairs are necessary to improve the quality of the stormwater drainage system which will reduce the flood risk and make maintenance easier in the future.
We will work for up to eight-nights from Sunday 9 November and Thursday 27 November 2025, weather permitting.
Work hours are from 8pm to 5am, Sunday to Thursday.
We will not work on Friday or Saturday nights.
There will be temporary traffic changes that will include lane closures, and a reduced speed limit of 40km/h. Traffic control will be in place to assist pedestrians and road users if required.
Please drive and ride to the conditions and follow the directions of signs and traffic controllers.
Thank you for your patience during this time.
For the latest traffic updates across the network download the Live Traffic NSW App, visit livetraffic.com or call 132 701.